TANKS
A LOT
Inside the Space Shuttle Vehicle Assembly Building at Kennedy Space
Center, Fla., a technician (left) watches the progress of the
external
tank as it is lowered between the solid rocket boosters (SRBs)
on the mobile launcher platform. The 154-foot-long (47-meter-long)
tank, designated for the Return to Flight mission STS-114, will
be mated to the SRBs for launch. The tank was recently redesigned
to meet recommendations of the Columbia Accident Investigation
Board before returning to flight. STS-114 is scheduled to launch
during
a window extending from May 15 to June 3. |